The Jetty is located in Kanci, Cirebon, West Java for 13,000 DWT capacity Barge. Before construction, we have many alternatives of  jetty model will be applied at that time. Finally, our client of Doosan Heavy Industry Co.Ltd determined the economic jetty design as follows: lenght of trestle 1.96 km and platform size 20 m x 180 m. The trestle has a function for acces road, sea water intake pipe line and conveyor system line. Meanwhile, the jetty platform for unloading slewing grab crane system. DSS completed this project within 19 months with “zero accident”.  This is also one of EPC project.